Prepared for Leo Meredith, LM Architectural Builders
The LM experience, on every job.
Keep the care your clients praise. Give every update and every decision a place to land, so none of it rests on one phone.
What we see
Your clients already say it.
Your clients describe being briefed on site, by email and on phone, and being able to reach you any time. That is the standard. The question is where all of it lands.
In a BRANZ survey of 195 New Zealand builders, almost half talked to clients several times a day, much of it outside business hours. BRANZ SR461/1
“Readily available at any time and always responded to queries immediately … recording all decisions as the build progressed.”
An LM client, lmab.nz
“Anything that differed from the original concept was communicated straightaway.”
An LM client, lmab.nz
Stage one
Every client knows where their build is.
On Friday, someone on site records a quick voice note and snaps a few photos. That becomes a draft update. The office checks it, and sends it. The office starts from a draft, not a blank page.
Voice note and 3 photos from site
Draft update
Roof is on and the house is closed in. Windows arrive Tuesday, cladding starts after that.
- Their own private build pageOn their phone, whenever they want to look.
- Where the build is, and this weekThe update the office approved, with the photos.
- What’s next, and every documentThe coming stages, plans and signed changes in one place.
Stage two
Every change signed before it’s built.
A variation is written up with its cost and time. Your QS still prices it. The client reads it, signs on their phone, and it is on record before anyone builds it.
- Written up
- Priced by your QS
- Signed on the phone
- On record
Stage two · try it
Carry one decision.
A made-up builder and a made-up home. Take one change from a text message to a signed record.
- The client asks for a wider kitchen window
- Change 03 lands on their page
- They read it and sign
- It sits in the build record
Fictional example. Nothing you type here is stored or sent.
Your new home: 14 Kowhai Lane
Hi Sam
This week
The roof is on and the house is closed in. Windows arrive Tuesday and the cladding starts after that.
Next: Windows and cladding
Waiting for you
- What changes
- The kitchen window goes from 1.8 m to 2.4 m wide, to look over the back garden. The lintel is upsized to suit.
- Asked for by
- You, by text on Monday
- Cost change
- Plus 1,980 dollars including GST (example figure)
- Time change
- None, if signed by Friday so the window can be ordered with the others
- Changes to the contract so far
6402,620 dollars (example figures)
Signed. Thank you.
Build record
- Signed change 02Extra power points in the garage
- Building consentApproved plans
- Architect plansIssued for construction, set C
Stage three · comes once the first two work
Beyond handover.
The care carries on after the keys, so the next great client finds you ready.
- Selections with clear deadlinesConcept “Kitchen tapware, choose by 12 Dec”, on their page.
- A home-care guide at handoverConcept Products, warranties and maintenance reminders in one place.
- Aftercare requests with a photoConcept Tracked to done, so nothing slips after you have moved on.
- A review asked for at the right momentWhen the client is happiest, not months later.
Where it stops
It sits beside what you use for quoting and the numbers.
Buildxact, Fergus, Xero, whatever runs your estimates and accounts stays as it is. No estimating, job costing, scheduling or consents from us.
You stay in charge of prices, contracts and every word your clients see. Built around how LM already works, not off the shelf.
The pieces already run for our clients. The builder version would be set up for LM first.
If it fits how you work
20 minutes with Richard on Google Meet.
Richard shows you the working demo, and how it could fit an LM build. Pick a time and the Meet link comes straight to your inbox.
Richard, C.E.A Smith